One of the modules will be for the Saratov power hub, the other will be sent to Orenburg Region.

    The equipment will be used for drying transformer insulation of Gazpromenergo's production subsidiaries.

    Transec modules from this batch are equipped with coarse filters to regenerate contaminated oil, and humidity and temperature monitoring systems for online transformer drying control.

    The equipment for oil-filled transformers insulation drying will improve the operating quality of Gazpromenergo production subsidiaries as well as operating reliability and safety of the main equipment.

    Medium a291486dcb7817b18636941346a8a702

    Previous article